1.Slip tank

2.Mould machine line

3.Open the mould by manual casting

4.First green fettling

5.Final green fettling

 6.Open the mould by machine line

7.Final open the mould

8.Casting pieces

9.Drying

10.Dry fettling

11.Spray glazing

12.Loaded products in kiln

 

13.Finished the firing

 

14.Finished the products

15.First inspection

16.Flushing test

17.Second inspection

18.Packing

19.Loading